The Eurasia Tunnel Project connects the Asian and European continents via a highway tunnel crossing beneath the seafloor.
        
        
       
        
            The Eurasia Tunnel Project (Istanbul Strait Road Tube Crossing Project) connects the Asian and European 
            sides of the city via a highway tunnel crossing underneath the seafloor. The Eurasia Tunnel, between
             traffic-dense Kazlıçeşme and Göztepe, covers a route of 14.6 kilometers. 
        
        While the 5.4-kilometer section of the Project consists of a twin-deck tunnel under the seafloor built with special 
            technology and connection tunnels, a total of 9.2-kilometer routes on both the Asian and European sides
             includes road expansion and improvement works. The approach roads between  Sarayburnu-Kazlıçeşme and
             Harem-Göztepe were expanded and intersections, vehicle underpasses and pedestrian overpasses were constructed.
        
        The tunnel crossing and highway improvement-expansion work eases vehicle traffic in a holistic manner. 
            It enables drivers to experience the freedom of a safe and comfortable journey while the duration of
             travel time on a heavily trafficked route is considerably shortened. In addition, environmental and 
            noise pollution are reduced.
        
        Republic of Turkey Ministry of Transport and Infrastructure, General Directorate of Infrastructure Investments commissioned Eurasia Tunnel Operation Construction and 
            Investment Inc. (ATAŞ) to carry out the design, construction and operation of the Eurasia Tunnel 
            Project. After the completion of the operation period, the Eurasia Tunnel will be transferred to the public.